Construction of hotel complex with residential apartments PANORAMA
with commercial, social-consuming, non-residential spaces
and underground parking located in 6, Sadovaya Street in Uman, Cherkassy province
Customer: “Vikland Ltd.” Chief designer: “Mria Ltd.” (Ukraine)

 General Manager of the Project: Greenfeld Project Promotion (Austria), Mr.Greenfeld I.V. ... »

Explanatory note

The complex in project is located in the central planning area of Uman city, Turok suburb.

The lot for design is restricted by Sadovaya street , Ostrovsky street and Engels street . The lot area provided for construction is 0.632 hectare.

The hotel complex in project consists of three sections connected by 3-storeyed stylobate unit.

The following area of the complex has the below functions:

•  underground parking;

•  commercial center with social – consuming areas servicing guests and people living in the hotel part of the complex;

•  hotel section;

•  administrative space;

•  fitness center with swimming pool;

•  technical spaces.

The underground parking is designed for 77 vehicles. The project includes rooms for guard next to the parking entrance-exit. Visitors approach to the hotel block from the parking is provided by elevators and staircases. Entrance and exit from the parking are to Sadovaya and Engels streets.

The commercial center with social-consuming areas servicing guests and people living in the hotel block of the complex include:

•  supermarket of food stuff and culinary;

•  home appliances store;

•  a bank branch;

•  communication center (post-office, telephone, Internet);

•  pharmacy;

•  public catering facilities;

•  commercial spaces for shops (clothes and etc.);

•  dry cleaning shop and laundry;

•  commercial spaces of social intention (jewelry and cultic stuff);

•  first aid center; dentist's office (subject to coordination with the Health Authorities);

•  halls for conferences, presentations, etc.

Central entrance to the commercial center is from Sadovaya street . Provided a regulation mode for approach of visitors and people living in the hotel. Organization of planning foresees effective use of facades as show-windows in Sadovaya street . Connection between the stores is provided by staircases, moving stairways and elevators.

The separate block consists of 5-, 7- and 9-storeyed sections. Each section is planned to have a communication core including staircases for evacuation of people, elevators, engineering communications, chambers for garbage disposal.

The administration spaces include the rooms of exploitation company and a central room controlling the complex.

The fitness center includes a swimming pool, a universal hall for fitness exercising, and a gym.

Technical space includes:

•  boiler room;

•  room for diesel-generator substation;

•  transformer substation;

•  multi-zone system of air-conditioning;

•  heat station;

•  pump station;

•  ventilation chambers system

The project provides flow division of guests of the hotel block and visitors of the commercial halls, social-consuming spaces, non residential rooms and a parking.

Provided the isolated zone of technological servicing of the complex. Stylobate part is along Sadovaya street . In the center of the volume planning composition there is a yard with possibility of separate approach of cars and buses to the territory of the complex.

Technological servicing of the complex is fulfilled from Sadovaya and Engles streets. The project provides reconstruction of Sadovaya street in the frames of construction with assuring the transport side lane.

In order to provide connection with buildings and erections existing around, brickwork is used as finishing material.

 

General plan.

Top view.
Top view.
Top view.
Top view.
General view of the
complex from Sadovaya St.
General view of the complex
from Sadovaya St.
Main facade
in Sadovaya St..
Orthographic projection.
Yard.
Perspective view.
Main facade .
Side face
from Ostrovsky St.
Side dace from Engels St.
Side dace from Engels St.
Photo of model.

Photo of model.
Plan of the standard storey.
Plan of the first storey .
Plan of the second storey.
Plan of the third storey.
Layer.
Parking plan.
Situation scheme in
the borders of the quarter.
Land section
allotment plan.
Panorama of the construction lot.
Situation scheme of the lot.
Panorama of the construction lot.

Main technical-economical characteristics.  

General area of the complex – 24 272 m2

Distribution of the complex areas:

•  hotel block for 195 rooms – 10472 m2

•  commercial spaces with social-consuming goals – 6023 m2

•  SPA center – 593 m2

•  Parking – 3276 m2

•  Technical and technological rooms – 4501 m2

Table 1

Storey
Rooms
Area – m2
Section 1
Section 2
Section 3
General area – m2
-1
Parking for 77 lots
3276
4710
Technical facilities rooms
294,8
SPA center
153
55
100
55
Commercial spaces with social-consuming goals
144
1
Commercial spaces with social-consuming goals
1470
2585
Hotel block
577
SPA-center
440
Engineering center
128
2
Commercial spaces with social-consuming goals
1822
2816
Hotel block
994
492
(9 rooms)
502
(9 rooms)
2*
Hotel block
994
492
502
994
Technical rooms
3
Hotel block
1012
492
(9 rooms)
502
(9 rooms)
3006
Commercial spaces with social-consuming goals
1994
4
Hotel block
1012
492
(9 rooms)
502
(9 rooms)
2174
Technical rooms
180
180
5
Hotel block
1619
520
(9 rooms)
579
(10 rooms)
520
(9 номеров)
1619
6
Hotel block
1619
520
(9 rooms)
579
(10 rooms)
520
(9 rooms)
1619
7
Hotel block
1599
500
(10 rooms)
579
(10 rooms)
520
(9 rooms)
1599
8
Hotel block
1080
560
(9 rooms)
520
(9 rooms)
1420
Attic space
Technical rooms
370
370
9
Hotel block
520
520
(9 rooms)
890
Attic space
Technical rooms
370
370
10
Hotel block
440
440
520
Attic space
Technical rooms
80
80
11
Roof boiler room
320
320

320

Table 2

#

Characteristic

Unit

Number

1

The lot area

ha

0,632

2

Construction area

m2

4 475

3

Number of storeys

storey

3; 5; 7; 9.

4

Construction volume

m3

91 400

5

General area

Including area:

m2

24 272

 

A. Hotel part

m2

10 472

 

B. Built-in rooms

Including:

  • supermarket of food stuff and culinary
  • home appliances store
  • a bank branch
  • communication center (post-office, telephone, Internet)
  • pharmacy
  • commercial spaces
  • dry cleaning shop and laundry
  • first aid center
  • fitness center

m2

 

m2
m2
m2
m2
m2
m2
m2

 

 

6 023

 

C. Underground parking for 77 vehicles

m2

3 276

 

D. Technical rooms of general purposes

m2

4 501

6

General area of rooms

m2

 

7

General number of rooms

шт.

195

8

Open parking area

m2

 

9

Area of transformer substation

m2

67

10

Number of created working places

Places

11

Time of construction

Months